[
Return to Main Page ] [
Return to Projects Index
] [
Doc's Machine & TWB Store] [
Contact Us ]
[
The Whiteboard Webcomic
]
The only real tricky part of this mod is the LED's "crack pipe" vertical
ASA. The original LED had an odd arrangement where the VASA
had a small
pipe sticking out the back, that connected to a port in the front of
the grip frame, which in turn had a small O-ring-sealed
passage that met
up with a port in the body, which led to the valve chamber.
The Etek frame, however, is largely hollow at the front, to accomodate
the LPR-to-solenoid hose and the eye loom,
so we can't just drill it for
the same passages.
Also, the decision to use the
grip spacing for the mounting bolts instead of the body spacing, put the front mounting screw
actually
ahead
of the air port leading up into the body. This was, however, taken into
account when planning the layout, and was
easily worked around. Checking the placement of the LPR body, it was clear a new port could be moved forward just over an inch
All text, photos and graphics
Copyright 1998- 2015, Doc's Machine & Airsmith Services. All Rights
Reserved.
Information contained in
these pages is for reference and entertainment
purposes only. Our methods are not always the best,
quickest, safest, or even the correct ones. It's up to you to know how
to use your own machines and tools.
Keep your fingers away from the spinny blades o' death and you should
be all right.